Renovation of Power Supply with Medium and Low Voltage Switchgear
Renovation of a total of 10 transformer stations within the Bundeswehr property Stetten a.k.M.: Dismantling and disposal of existing plant technology; installation of new medium-voltage, low-voltage switchgear and transformers in new precast concrete stations (1x handover station, 6x substations); structural upgrading of 3 existing transformer buildings with new station technology. Main quantities include: 9 units dismantling 20 kV medium-voltage switchgear (MSA), 9 units dismantling 0.4 kV low-voltage main distribution boards (NSHV), 1 unit grid operator (VNB) handover station in 2 rooms with 2x 8 units medium-voltage fields, 7 units 20 kV air-insulated MSA as substation with 4 units medium-voltage fields, 2 units 20 kV air-insulated MSA as substation with 5 units medium-voltage fields, 11 units cast resin transformers 20/0.4 kV, 800 kVA, 7 units 0.4 kV NSHV with 9 low-voltage fields, 3 units 0.4 kV NSHV with 12 low-voltage fields, 1 unit VNB meter cabinet, 1 unit control cabinet for remote control technology and generation plant controller (EZA-Regler), 10 units PV meter cabinets with grid connection protection (NA-Schutz) and ÜEKS decoupling protection, 10 units installation of transformer stations with sub-distributors, lighting, and installation devices, 10 units data distributors, 11,400 m fiber optic cables (LWL-Kabel), 26,400 m building automation cabling (GA-Verkabelung) as well as cables and lines of various types and cross-sections.
CONTRACTING AUTHORITY
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45000000, Construction work.
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
No
Electronic Submission
allowed
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
28 days remaining(LOT-0000)
Published