Sludge Treatment, Digester 3 Renovation, and Concrete Coating for Emscher-Mündung Wastewater Treatment Plant
New construction of the sludge treatment for the Emscher-Mündung Wastewater Treatment Plant, renovation of three digesters, their conversion to series operation, and concrete coating works. This includes the repurposing of a culvert as a utility duct between sludge treatment and inlet, its extension with a branch towards digestion, the new construction of a pump station for sludge transfer to Bottrop Wastewater Treatment Plant, and the installation of two new pressure pipelines (each 0.65 km) up to the connection point to existing pressure pipelines.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 551051-2026HTML
- TED PDF — 551051-2026PDF
- TED XML — 551051-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.