Turnkey construction of a Battery Energy Storage System (BESS) in Oberelchingen
Turnkey construction of an industrial Battery Energy Storage System (BESS): nominal power (charge/discharge) 10 MW, usable capacity 20 MWh (alternatively 40 MWh – 4h system), Round-Trip-Efficiency (RTE) ≥ 90 % (better 95%), battery technology Lithium-ion (LFP preferred) or proportionally Sodium, lifespan ≥ 15 years / ≥ 10,950 cycles at 2 cycles/day, SOH requirement ≥ 65 % after 15 years. Application area Multimarket (control energy, intraday, peak-shaving, FCR/aFRR, arbitrage etc.), instantaneous reserve. Grid connection 20 kV medium voltage at location GPS: 48.44615583008373, 10.10022126790465, parcel 773, district Oberelchingen. The service includes planning, delivery, construction, assembly, commissioning, documentation, and technical operation including defined guarantees.
CONTRACTING AUTHORITY
Name
Netze ODR GmbH
City
Ellwangen
Country
DE
CLASSIFICATION
Procedure Type
neg-w-call
Contract Type
Works
Main CPV
45315300, Electricity supply installations.
ADDITIONAL DETAILS
Suitable for SMEs
No
Electronic Submission
allowed
Legal Basis
32014L0025
DEADLINES & TIMELINE
Submission Deadline
36 days remaining(LOT-0001)