Safety and Health Coordination for the Construction of A 14, VKE 1154
Safety and Health Coordination (SiGeKo) according to the Construction Site Ordinance (BaustellV): Construction of the Federal Motorway A 14 (BAB 14) in Brandenburg, traffic unit (VKE) 1154, from the Wittenberge interchange (AS) on B 189 / B 195 to south of the Karstädt interchange, length 17.777 km, including the construction of a managed service area. The project includes the construction of the motorway alignment (length 17.777 km), completion of the remaining Wittenberge interchange up to 3+100, construction of a single-sided managed service area Löcknitztal (approx. 16+000), 14 bridge structures along the motorway, 9 overpass structures (including 2 green bridges, 4 fauna bridges, 1 structure for the access and exit to the service area, 1 structure along a state road, 1 structure along an agricultural road), 2 weirs, 8 traffic sign bridges, guidance and barrier systems and irritation protection walls approx. 5,000 m, 21 culverts, noise barriers, various intersections and junctions, various utility relocation measures, cycle and agricultural paths with a total length of approx. 18.720 km, ditch adjustments, route telecommunication cables, wildlife and otter protection fences, amphibian guidance systems, signage, marking, vehicle restraint systems. The construction project is divided into several partially parallel construction contracts for route construction and structures. The entire construction site area, including temporary space requirements, areas for site facilities, scaffolding, and work areas, must be considered during the planning and execution phases.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 571993-2026HTML
- TED PDF — 571993-2026PDF
- TED XML — 571993-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.