Sports Hall Interior Fit-out for Triple Gymnasium
Sports hall interior fit-out for the new construction of a triple gymnasium in Fürth-Stadeln: approx. 1,500 m² area-elastic sports flooring (sprung floor 20 cm) with sports floor heating and heating circuit distributors, linoleum top layer; approx. 145 m² area-elastic sports flooring (sandwich floor 15 cm) with sports floor heating and heating circuit distributor, linoleum top layer; approx. 410 m² area-elastic impact wall with wooden substructure and acoustic elements made of multiplex slotted panels; 5 pcs. equipment room gates; 4 pcs. sports hall interior door systems, single and double leaf; 1 pc. sports hall exterior door system, double leaf; 2 pcs. control room windows; 5 pcs. sports equipment and inspection doors, various sizes; approx. 375 m² acoustic wall cladding with multiplex slotted panels; approx. 55 m² acoustic wall cladding slats 40/8, horizontal; approx. 130 m² ball-proof acoustic ceiling slats 40/20; coordinated workshop and assembly planning.
CONTRACTING AUTHORITY
Name
Stadt Fürth
City
Fürth
Country
DE
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45212225, Sports hall construction work.
Other CPV
45212222, Gymnasium construction work.
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
No
Electronic Submission
Required
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
22 days remaining(LOT-0000)
Published