Scaffolding works for Staatliche Grundschule Niedersalza
Notice title: Staatliche Grundschule Niedersalza; Los 06 - Gerüstarbeiten
Scaffolding works: Technical processing including 1.00 unit static calculation for working scaffolding, 1.00 unit anchoring plan, 1.00 unit scaffolding anchoring protocol, 1.00 lump sum scaffolding acceptance, 1.00 unit separate journeys. Scaffolding includes 150.00 m² subgrade for erection, 1,030.00 m² erection and dismantling of longitudinally oriented standing scaffolding working scaffolding 3kN/m² W09 H2, 20,000 m²Wo usage provision of longitudinally oriented standing scaffolding working scaffolding, 41.00 m² working and protective scaffolding LK 3/W06 erected on roof, 330.00 m²Wo usage provision of working and protective scaffolding 2kN/m² W06 H2, 41.00 m² dismantling of working and protective scaffolding 2kN/m² W06 H2, 12.00 m² scaffolding substructure, roof support areas, erection and dismantling, 96.00 m²Wo usage provision of scaffolding substructure, 45.00 m² erection and dismantling of working and protective scaffolding LK 3/W06 erected on pitched roof with roof stand, 360.00 m²Wo usage provision of working and protective scaffolding LK 3/W06 erected on pitched roof with roof stand, 142.00 m erection and dismantling of roof edge protection net B up to 0.45m, 3,200.00 mWo usage provision of roof edge protection, 375.00 m erection and dismantling of platform widening wall-side B up to 0.33m, 7,500.00 mWo usage provision of platform widening, 5.50 m erection and dismantling of platform widening console width over 0.66 to 1.00m, 110.00 mWo usage provision of platform widening, 20.00 m erection and removal of side protection all scaffolding levels, 600.00 mWo usage provision for side protection, 50.00 m erection and removal of inner railing all scaffolding levels 3 layers, 400.00 mWo usage provision of inner railing, 190.00 m² attachment and removal of scaffolding cladding nets scaffolding anchoring, 3,000.00 m²Wo usage provision of scaffolding cladding, 2.00 units scaffolding reinforcement elevator, 1.00 unit erection and dismantling of pre-built staircase with several platforms, 30.0 unitsWo usage provision of staircase, 4.00 units erection and dismantling of additional ladder access H 5-6m, 100.00 unitsWo usage provision of additional ladder access, 1.00 unit creation and dismantling including transport of stair tower as construction site access (2nd escape route), 30.00 unitsWo usage provision, 3.00 units transition stair tower building, 90.00 unitsWo usage provision of transition stair tower, 25.00 m erection and dismantling of system truss bridge L up to 5.0m, 500.00 mWo usage provision of system truss bridge, 1.00 unit erection and attachment of protective roof, 30.00 unitsWo usage provision of protective roof, 4.00 units erection and dismantling of safety light maintenance, 120.00 unitsWo usage provision of safety light, 20.00 units modification of standing scaffolding by installation and removal of scaffolding anchors, 90.00 m modification of standing scaffolding by installation and removal of consoles, 60.00 m² modification of standing scaffolding by installation and removal of scaffolding levels. Interior scaffolding includes 35.00 m³ erection and dismantling of working/protective scaffolding (room scaffolding), 300.00 m³Wo usage provision of working/protective scaffolding (room scaffolding), 2.00 units erection and dismantling of mobile work platform 2kN/m² H up to 2.0m, 20.00 unitsWo usage provision of mobile work platform, further items as per the tender documents.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 769595-2026HTML
- TED PDF — 769595-2026PDF
- TED XML — 769595-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.