Steel construction and locksmith works for the new Ilvesheim combined swimming pool
Steel construction and locksmith works for the new Ilvesheim combined swimming pool: workshop planning including static verification, manufacturing, delivery, and installation of railings, shaft covers, an enclosure for the heat pump, a double-leaf steel waste room door, fire extinguisher cabinets, stainless steel handrails, and a steel staircase for an emergency exit. This includes approx. 8m railings in the insertion shaft area, approx. 7m plug-in railings in the insertion shaft area, approx. 1 pc. shaft cover for the heat pump light shaft, approx. 15m² enclosure for the heat pump made of steel profiles with aluminum Z-lamella cladding, approx. 1 pc. emergency exit shaft cover, approx. 1 pc. emergency exit ladder, approx. 2 pcs. shaft covers in the interior, approx. 6 pcs. fire extinguisher cabinets, approx. 27m stainless steel handrail, approx. 1 pc. staircase with 3 risers and railing at the technical room emergency exit. All fastening, assembly, and documentation works, including inventory and maintenance documents, are included. Execution dates: start approx. 05/2027, completion approx. 08/2027.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 505757-2026HTML
- TED PDF — 505757-2026PDF
- TED XML — 505757-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.