Road construction for the expansion of Miltitz village bypass, network section 3
Road construction for the expansion of network section 3 of K9236 Miltitz village bypass to junction K9230, total length 650 m: Road surface renewal over 650 m with 2 asphalt layers, new construction of a cycle path over 480 m, of which 174 m are within Miltitz village without road widening. For the new cycle path, a 61 m long support structure made of rectangular concrete palisades with free heights up to 1.10 m is required. Key services include: 1,190 m³ topsoil work, 710 m³ earthworks, 1,195 m³ frost protection layers and soil exchange, 290 m³ shoulder stripping, 390 m³ new shoulder construction, 5 units tree felling, 9 units temporary tree protection, 150 m paving strips and gutter strips, 130 m new kerbstones, 5,150 m² breaking up and removal of asphalt surface, 1,280 m² new two-layer asphalt surface for cycle path, 5,150 m² two-layer surface renewal for carriageway, 2,815 m road marking, 40 m² roll plastic road marking, 295 m asphalt joints, 18 units traffic signs, 2 units large-area signposts, 61 m palisade support, 105 m drainage pipe, 12 m pipe culvert DN 300. Execution period: 12.10.2026 to 30.01.2027. Qualification requirements according to VOB/A and tender documents, including proof of a qualified civil engineer for site management.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- 25659940NON-RESTRICTED-DOCUMENT
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.