Track Modernization Section 2, Construction Lot 30 – Krems Tunnel for the GKB Lieboch (e) – Köflach (e) Line
Status
Active
Submission Deadline
24 days remaining
Contracting authority
ÖBB-Infrastruktur AG13 more open tenders view
Location
Wien, Austria
Procedure
Open Procedure · Works
Category
Construction work for bridges and tunnels, shafts and subways.Engineering works and construction works.Construction work for engineering works except bridges, tunnels, shafts and subways.
Published
Reference
ted-537251-2026
Source
Construction works for Krems Tunnel Construction Lot 30: Widening of the tunnel cross-section to create the necessary space for pantographs and overhead line support structures as part of the electrification of the Lieboch (e) – Köflach (e) line section.
Free
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 537251-2026HTML
- TED PDF — 537251-2026PDF
- TED XML — 537251-2026XML
Free
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.
Additional details
Electronic Submission
Required
Legal Basis
32014L0025