Civil Engineering Works for Earthworks, Bored Pile Wall, and Groundwater Management
Civil engineering works: approx. 1,080 m² removal and disposal of vegetation cover, approx. 1,300 m³ wet excavation to target depth, loosening and temporary storage, approx. 12 m³ drilling spoil and micropile production, collection and temporary storage, approx. 1,100 m³ soil from temporary storage, collection, installation and compaction, approx. 15 plate load tests according to DIN 18134, approx. 875 m² construction of overlapping bored pile wall, approx. 120 m² provision of trench shoring equipment up to 3 m and dismantling, 1 concept and design for groundwater dewatering system.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 644538-2026HTML
- TED PDF — 644538-2026PDF
- TED XML — 644538-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.