Carpentry (Wooden Doors) for Renovation and Expansion of Westpfalz-Klinikum Kirchheimbolanden
Carpentry (wooden doors): 26 units single-leaf wooden doors T90-RS / EI2 90-S200-C5, in various dimensions, W/H= approx. 0.885-1.01/2.135 m; 9 units single-leaf wooden doors T30-RS / EI2 30-S200-C5, partly with additional sound insulation requirements, in various dimensions, W/H= approx. 0.885-1.135/2.135 m; 5 units single-leaf wooden doors RS / S200-C5, in various dimensions, W/H= approx. 1.01-1.26/2.135 m; 23 units single-leaf wooden doors RwP 42 dB, in various dimensions, W/H= approx. 1.01-1.26/2.135 m; 68 units single-leaf wooden doors RwP 37 dB, partly additionally as wet room doors, in various dimensions, W/H= approx. 1.01-1.26/2.135 m; 1 unit single-leaf sliding door RwP 42dB, W/H= approx. 1.51 x 2.135 m; 15 units single-leaf sliding doors RwP 37dB, W/H= approx. 1.51 x 2.135 m; 54 units single-leaf wooden doors, in various dimensions, W/H= approx. 0.885-1.26/2.135 m; 22 units single-leaf wooden doors as moisture-resistant doors, in various dimensions, W/H= approx. 0.76-1.135/2.135 m; 56 units single-leaf wooden doors as wet room doors, in various dimensions, W/H= approx. 1.01-1.26/2.135 m; 7 units single-leaf sliding doors, in various dimensions, W/H= approx. 1.05-1.51/2.135 m. Execution deadlines: Start of construction within 12 working days after receipt of the request from the client (§ 5 para. 2 sentence 2 VOB/B), request expected by 26.04.2027; construction completion within 250 working days after start of execution. The contractual deadline refers to on-site execution; the period before is for technical clarification as well as shop and assembly planning. Submission of door list and construction drawings: 42 working days after order placement. Completion of frame installation Level -1/0: 36 working days after start of execution. Completion of frame installation Level +1/ +2: 114 working days after start of execution. Completion of door leaves Level -1/0: 190 working days after start of execution. Completion of door leaves Level +1/ +2: 250 working days after start of execution.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 578293-2026HTML
- TED PDF — 578293-2026PDF
- TED XML — 578293-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.