Structural Engineering for the New Construction of the Center for Pediatric and Adolescent Medicine
Structural engineering for the new construction and conversion of a three-story Center for Pediatric and Adolescent Medicine at Marienhospital Bottrop, according to § 51 HOAI, service phases 3-6. The center consolidates pediatric, neonatological, and obstetric care, as well as associated outpatient and inpatient areas. The new building includes a pediatric emergency room with shock room and intervention rooms, a pediatric day clinic, interdisciplinary examination and treatment areas (nephrology, neuropediatrics, gastroenterology, urology), pediatric intensive care and IMC services, a maternity ward, a general pediatric ward including isolation areas, and a delivery room. The building comprises approximately 50 patient rooms with a total of 79 beds. Floor areas and volumes according to DIN 277: Gross Floor Area (GFA) 8,193.09 m², Construction Area (CA) 723.40 m², Net Room Area (NRA) 7,469.69 m², Usable Area (UA) 5,087.07 m², Technical Area (TA) 258.03 m², Circulation Area (CircA) 2,124.59 m². Gross Volume (GV) 29,818.02 m³. Usage units: 79 beds. The cost framework for the construction project according to DIN 276 is approximately 12,778,000 EUR net for building construction and approximately 9,900,000 EUR net for building technical installations.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 751669-2026HTML
- TED PDF — 751669-2026PDF
- TED XML — 751669-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.