Drywall, Painting, and Plastering Works for Terminal 1 Restructuring
Drywall, painting, and interior plastering works for the complete spatial restructuring of the high hall B Mitte area with adjacent shopping areas "Avenue" and "Boulevard" in Terminal 1, Building 203 of Frankfurt Airport, levels E02, E03, and E04, covering approx. 16,000 m²: approx. 1,900 m² drywall for walls, shaft walls, and furring; approx. 1,300 m² drywall construction walls and their dismantling; approx. 1,000 m² suspended ceilings made of gypsum boards on metal substructures; approx. 3,000 m² suspended ceilings made of metal panels and metal lamellas; approx. 9,000 m² paintwork on walls and ceilings; approx. 600 m drywall fire protection cladding around steel profiles; approx. 550 m² construction fences for indoor barriers; approx. 3,000 m² coverings for site protection on floors and glass facades; including fire protection cladding for steel components, small-scale dismantling of existing fire protection cladding made of mineral fiber boards, manufacturing and assembly of steel profile substructures, provision of construction walls and protective measures, and earthquake resistance verification for suspended ceilings. Planned start of execution: Q3/2027, planned end of execution: Q2/2031.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 586094-2026HTML
- TED PDF — 586094-2026PDF
- TED XML — 586094-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.