Drywall works for existing roof of Energy Museum, former Kraftwerk-Mitte Dresden
Drywall works for the existing roof of the Energy Museum in the former Kraftwerk-Mitte Dresden: thermal insulation layer of mineral wool (0.035W/(mK) D 180mm, rafter spacing 80-90cm, <3.6 kg/m²) approx. 550 m², adaptation of thermal insulation layer to roof construction approx. 160 m, moisture-variable airtightness layer (sd,min ≤ 0.3 m; sd,max ≥ 23 m) approx. 550 m², adaptation of airtightness layer to various substrates (masonry, steel framework) approx. 350 m, cladding of the roof slope with 12.5 mm plasterboards including substructure and insulation securing approx. 550 m², wooden eaves cornice for cladding the eaves connection approx. 90 m, mobile work platforms and scaffolding above the stairwell, and component-related airtightness measurement (blower-door test) for verifying the roof construction's airtightness.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 574026-2026HTML
- TED PDF — 574026-2026PDF
- TED XML — 574026-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.