Traffic Infrastructure Planning for Stops in Munich
Traffic infrastructure planning for service phases 3 according to HOAI: creation of barrier-free access, extension and elevation of platforms at the four stops Am Münchner Tor, Anni-Albers-Straße, and Domagkstraße; rearrangement of waiting shelters; addition of tactile paving and railings; connection to existing structures or new ramps and angle elements for embankment support. Consideration and finalization of interfaces, including agreements with LHM regarding asphalt surfaces and curbs in adjacent areas, track construction work (rail grouting, rail joints, asphalt surfacing, green track on the track body and next to the rails), track and road drainage, other work on the road space and at stops, graphical representation and coordination with specialist planners and the mobility department, traffic technical investigation, planning of lighting systems, construction schedule planning, and continuous updating of the utility inventory plan.
CONTRACTING AUTHORITY
Name
Stadtwerke München GmbH
City
München
Country
DE
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Services
Main CPV
71300000, Engineering services.
Other CPV
71320000, Engineering design services.
ADDITIONAL DETAILS
Suitable for SMEs
Yes
Electronic Submission
Required
Legal Basis
32014L0025
DEADLINES & TIMELINE
Submission Deadline
53 days remaining(LOT-0000)
Published