Electrical Installation for 4th Construction Phase
Notice title: VMD 4. BA Los Elektro
Electrical installation for heavy current systems in the basement and risers, as well as in 153 apartments (all figures approximate values): In the basement and risers, the electrical system includes 15 meter cabinets with a total of 168 meter positions, 15 house light distributors, 153 apartment distributors, 153 multimedia distributors, 668 m cable trays and riser routes, 634 m metal and fire protection ducts, 16.3 km cables and lines, 521 installation devices, 411 luminaires. Additionally, 15 WSA outdoor panels and 153 WSA indoor units are to be renewed, and 4.8 km of low-current cables are to be renewed. The electrical installation for 153 apartments from existing apartment distributors includes 14.1 km skirting board, corner, and other surface-mounted ducts, 40.5 km cables and lines, 5,637 surface-mounted and skirting board duct installation devices, 153 infrared heaters, 1,075 m² plasterboard suspended ceilings, 467 recessed spotlights, and 140 balcony lights.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 621798-2026HTML
- TED PDF — 621798-2026PDF
- TED XML — 621798-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.