Restoration of Damp Marina
Demolition and renewal of shore protection Pier E in Damp marina: Demolition and disposal of the shore enclosure "Pier E" and stern piles, demolition of the existing shore wall with back-anchoring and embankment, pulling of stern piles, installation of new steel piles as pier foundation, profiling and construction of a riprap embankment, construction of the new Pier E with land connections and technical equipment, and placement of new stern piles. The renewal of the shore embankment will be as a riprap embankment with an integrated pier system and optional placement of new stern piles. Georeference: ETRS 1989 UTM Zone 32N; Height reference: m NHN (DHHN2016). The execution period is 87 calendar days.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 735472-2026HTML
- TED PDF — 735472-2026PDF
- TED XML — 735472-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.