Demolition and Dismantling Works for Canteen and Fire Protection in Building 2010-2030
Demolition and dismantling works: Protective measures for floors, stairs, and building components; approx. 3,500 m² hazardous material remediation in black areas; approx. 75 t mineral wool and 2 t waste wood (A IV); demolition of suspended ceilings (gypsum board, wood, mineral fiber) including substructure, approx. 4,700 m²; demolition of interior walls (masonry and drywall), approx. 3,000 m²; demolition of wall coverings (tiles, gypsum boards, wood), approx. 3,900 m²; demolition of screeds (cement, mastic asphalt) including coverings, approx. 3,800 m²; demolition of PVC, linoleum, and parquet flooring, approx. 2,700 m²; dismantling of interior doors (wood/steel) including steel frames, approx. 430 units; HVAC dismantling of radiators and HVAC piping, approx. 180 units / 8,500 m; HVAC dismantling of ventilation ducts and air handling units, approx. 1,000 m² / 4 units; HVAC dismantling of cables, lines, and electrical distributors, approx. 38,000 m / 45 units; HVAC dismantling of lighting systems, approx. 475 units; dismantling of hydraulic elevator systems, 2 units.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 549340-2026HTML
- TED PDF — 549340-2026PDF
- TED XML — 549340-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.