Gas, Water, and Drainage Systems for New Construction Life-inspired Engineering Molecular Systems (LEMS), 1st Construction Phase
Gas, water, and drainage systems: 2 lifting units; piping made of stainless steel (DN 15 - DN 32, approx. 2,150 m), cast iron (DN 80 - DN 200, approx. 247 m), plastic PE (DN 40 - DN 100, approx. 2 m), heat-resistant plastic PE (DN 50 - DN 150, approx. 1,076 m), and steel pipe (DN 20 - DN 125, approx. 1,065 m); 1 pressure boosting system for rainwater harvesting; a supply system for demineralized water; approx. 106 fire extinguishers; a process cooling system; 12 washbasins; 12 slop sinks; 17 toilets; 1 accessible toilet; 5 urinals; approx. 8 emergency showers; decentralized hot water preparation with approx. 9 instantaneous water heaters; connection of 5 client-provided fitted kitchens (sinks and dishwashers) including complete water and wastewater piping systems and all accessories.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 545983-2026HTML
- TED PDF — 545983-2026PDF
- TED XML — 545983-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.