Asphalt Renovation for Büsum Port

Asphalt renovation at Büsum Port: Demolition of the paved road superstructure over approx. 1,400 m², removal of excavated material to the client's storage areas, road reconstruction of approx. 500 m³, delivery and installation of a new asphalt surface, and delivery and installation of concrete block paving over approx. 1,100 m².

CONTRACTING AUTHORITY

Name

Landesbetrieb für Küstenschutz, Nationalpark und Meeresschutz Schleswig-Holstein

City

Husum

Country

DE

CLASSIFICATION

Procedure Type

de-open

Contract Type

Works

Main CPV

45000000, Construction work.

Other CPV

43000000, Machinery for mining, quarrying, construction equipment.

44000000, Construction structures and materials; auxiliary products to construction (excepts electric apparatus).

71000000, Architectural, construction, engineering and inspection services.

ADDITIONAL DETAILS

Legal Basis

de-vob

DEADLINES & TIMELINE

Submission Deadline

20 days remaining

(LOT-0000)

Published

TENDER DOCUMENTS

20 days remaining

Similar Tenders

Explore CPV 45

Environmental Assessments for Sand Extraction Westerland III

Environmental assessments for sand extraction Westerland III: Preparation of an Environmental Impact Assessment (EIA) according to § 3 para. 1 HOAI and a generally understandable summary (GUS) of the EIA according to § 6 para. 3 UVPG. Investigations of protected assets according to the scoping document of 19.03.2026, specifically the update of the sound report from 16.11.2007 for marine mammals. For fish, investigations are planned in extraction fields 2a to 2c and 3a to 3d, a reference area, and an existing extraction funnel (1a and/or 1b), with 15 trawl lines using a beam trawl per investigation period and an additional 15 hauls of pelagic fish with a suitable net during the spring/summer investigation. The test sections will be investigated over 2 years in the investigation period from autumn 2026 to summer 2028, including sampling times, equipment standards, and processing of fishing hauls according to STUK. Development of a Landscape Management Plan (LMP) according to § 31 para. 1 HOAI, all necessary NATURA 2000 compatibility studies according to § 34 BNatSchG (including any necessary exemption examination and description of coherence measures), a species protection expert report (SPER) with any necessary compensatory measures, as well as expert reports on the European Water Framework Directive (WFD) and the European Marine Strategy Framework Directive (MSFD). Three coordination meetings with the client in Husum are scheduled for the investigations of marine mammal and fish protected assets and the expert reports (LMP, NATURA 2000, SPER, WFD, MSFD). Processing of responses to objections and comments received during the participation procedure, participation in the public hearing, and a one-time revision of the documents based on the results of the public hearing (if required).

Landesbetrieb für Küstenschutz, Nationalpark und Meeresschutz Schleswig-Holstein

·Husum
Deadline:August 19, 2026

Environmental Impact Assessment and Expert Opinions for Westerland III

Environmental Impact Assessment (EIA) according to § 3 para. 1 HOAI and an easily understandable summary (AVZ) of the EIA according to § 6 para. 3 UVPG. This includes investigations of protected assets according to the scoping document of March 19, 2026, including an update of the sound report from November 16, 2007, for marine mammals. Fish investigations will be conducted in extraction fields 2a to 2c and 3a to 3d, with the recording of a suitable reference and an existing extraction funnel (1a and/or 1b). This comprises 15 trawl lines with a beam trawl per investigation period, plus 15 hauls of pelagic fish with a suitable net during the spring or summer investigation. The test sections will be examined over 2 years, from autumn 2026 to summer 2028, considering sampling times, equipment standards, and processing of fish hauls according to STUK. Furthermore, the preparation of a Landscape Management Plan (LBP) according to § 31 para. 1 HOAI, NATURA 2000 compatibility studies according to § 34 BNatSchG including any necessary exemption review and coherence measures, and an expert report on species protection law (AFB) with any necessary compensatory measures are included. Expert reports on the European Water Framework Directive (WFD) and the European Marine Strategy Framework Directive (MSFD) will be prepared. The contract includes three coordination meetings with the client in Husum for protected asset investigations and expert opinions, processing of responses to objections and comments received during the participation procedure, participation in the public discussion meeting, and a one-time revision of the documents based on the results of the public discussion meeting if required.

Landesbetrieb für Küstenschutz, Nationalpark und Meeresschutz Schleswig-Holstein

·Husum
Deadline:August 19, 2026

Flooring works for new construction of Bad Hofgastein childcare center

Flooring works for a childcare center: subfloor preparation of screed, delivery and installation of multi-layer parquet (including on cross-laminated timber stairs), installation of skirting boards, delivery of entrance mats, and supplementary services for execution.

Marktgemeinde Bad Hofgastein

·Bad Hofgastein
Deadline:August 18, 2026
€10M

Framework Agreement: Delivery of Public Realm Infrastructure, Fingal County Council

Framework Agreement for the delivery of public realm infrastructure: includes both employer-designed and contractor-designed projects. An initial contract involves the construction of a public play space and associated ancillary works at Hazelbury Park, Dublin 15.

Fingal County Council_371

·Dublin
Deadline:August 17, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now