Skip to main content
Activeted-485132-2026

Building Works and Maintenance for CU GPS&O Buildings

Building works and maintenance for buildings of CU Grand Paris Seine & Oise: Framework agreement divided into 4 lots, including wall and floor coverings and metal joinery and locksmith work.

CONTRACTING AUTHORITY

Name

CU Grand Paris Seine & Oise

City

Aubergenville

Country

FR

CLASSIFICATION

Procedure Type

Open Procedure

Contract Type

Works

Main CPV

45300000, Building installation work.

Other CPV

45432210, Wall-covering work.

45421140, Installation of metal joinery except doors and windows.

45432210, Wall-covering work.

45421140, Installation of metal joinery except doors and windows.

45432210, Wall-covering work.

45421140, Installation of metal joinery except doors and windows.

45432210, Wall-covering work.

45421140, Installation of metal joinery except doors and windows.

LOTS (4)

LOT-0001Works

Wand- und Bodenbeläge für Zone OST

LOT-0002Works

Wand- und Bodenbeläge für Zone WEST

LOT-0003Works

Metallbau- und Schlosserarbeiten für Zone OST

LOT-0004Works

Metallbau- und Schlosserarbeiten für Zone WEST

ADDITIONAL DETAILS

EU Funded

Yes

Electronic Submission

Required

Legal Basis

32014L0024

DEADLINES & TIMELINE

Submission Deadline

56 days remaining

(LOT-0001)

Published

TENDER DOCUMENTS

56 days remaining

Similar Tenders

Explore CPV 45
€4.7M

Concession for Wastewater Services in Sector F

Concession for the public service of collective wastewater sanitation: covers 5 communes in the territory of CU GPSEO in accordance with the Code de la Commande Publique. The communes are Carrières-sous-Poissy (until 31/12/2029), Juziers, La Falaise, Nezel, and Aulnay-sur-Mauldre.

CU Grand Paris Seine & Oise

·Aubergenville
Deadline:September 14, 2026

Landscaping works for Primary School 43

Landscaping works for the new construction of Primary School 43 in Erfurt-Vieselbach: 1 unit crown care for large tree (height up to 15m, width up to 10m) including tree protection (board casing) and watering during construction; 5 units secure and adjust shafts to height; 20 m protection of existing lines including securing of 5 units cable crossings and 3 units valves; 10 m³ earthworks and exploratory excavations by hand, partly under trees; 4 m³ demolish and dispose of foundations, of which 2 m³ by hand; 100 m³ loosen and dispose of soil; 100 m³ loosen and re-install soil; 180 m² prepare vegetation area, of which 50 m² by hand under trees; 160 linear meters steel band path edging; 60 m² concrete rectangular paving; 550 m² create asphalt surfaces in irregular partial areas, including surface treatment with reaction resin broadcast; 40 m² edging for play areas made of natural stone small paving, curved shape, width 0.8-1.2m; 160 m² fall protection surfaces, of which 40 m² wood chips and 120 m² fall protection sand; 85 linear meters ground markings (lines, circles, numbers); 10 m³ concrete foundations; 16 units bicycle stands; 9 units ram protection bars for waste bins; 2 units waste containers; 4 units bench-table combinations (steel basic construction, HPL coverings); 1 unit sun sail (side length 8m, triangular); 2 units seating platforms (steel basic construction, HPL coverings; triangular footprint, side lengths 2 to 14m); 1 climbing facility; 1 unit balancing facility; 1 unit round table tennis table; 12 linear meters wooden play wall (height up to 3m), install from client's stock, including substructure; 8m concrete block step; 50 m steel fence (frames and infill bars, height 1.7m, in sections of approx. 3m), partly to be fitted into existing plinth wall; 1 unit gate (two-leaf, width 1.5m); 2 units gates (width 1.1m) deliver and install; 28 units core drillings in existing plinth wall (depth 80 cm); 2 units decorative steel gates, from client's stock, refurbish and install (height 2m, width 4.6m, leaf); 65 m³ excavation for trenches for pipes and lines (depth up to 1m); 15 m³ create inspection pits, exploratory excavation; 30 linear meters stormwater drain in sections; 4 units yard drains B125 and C250; 120m drainage channels (nominal width 100, C250); 13 m facade channel A15 (width 185mm), installation in partial sections; 3 units clean-off grates 2.5*1.2 m; 85 linear meters cable protection pipes (PE DN 100); 6 m³ excavation pit for lighting mast; 5 units mast sleeves for lighting masts; 5 units standard trees (stem circumference 12-14 cm to 18-20 cm) deliver, plant, including completion and 2-year development care; 60 m³ tree substrate deliver and install; 185 m² create lawn; 50m leak test for sewer; workshop and assembly documents for fences and gates; detailed design for seating platforms; 2 units sampling and analysis of soil/excavated material according to EBV and LAGA; 4 units dynamic and 4 units static load plate; 1 unit digital new inventory survey; safety-technical initial inspection of entire outdoor area; winter construction site; planting works as a later partial service.

Landeshauptstadt Erfurt, Stadtverwaltung, Stadtkämmerei-Verdingungsstelle

·Erfurt
Deadline:August 12, 2026

Heating System Installation for Extension Building

Heating system installation for an extension building: Connection to the existing heating system of the main building via a new heating circuit including all necessary fittings, measurement, and safety devices. Execution as a closed hot water heating system according to DIN EN 12828, heating water compliant with VDI 2035. Hydraulic integration with a hydraulic separator and electronically controlled high-efficiency pumps with thermal insulation shells and communication interface. Fittings include shut-off valves, pressure-independent control valves, balancing valves, check valves, dirt traps, microbubble/magnetite separators, safety valves, thermometers, manometers, heat meters, filling, draining, and venting devices, all marked according to DIN 2403. Piping network as a two-pipe system made of seamless steel pipes (DIN EN 10216) with welded connections and sound-decoupled pipe clamps (DIN 4109), routing in technical rooms and above suspended ceilings, with thermal insulation according to the German Buildings Energy Act (GEG). Room heating via warm water underfloor heating as a low-temperature system in all common rooms, each with its own heating circuit. Heating circuit distributors are delivered pre-assembled, consisting of flow/return distributors, flow meters, pre-set valve inserts, shut-off, vent, draining devices, fastening systems, and distributor box. Preparation of heating circuit distributors for thermal/motor actuators, delivery and installation of distributors including valve inserts, creation of mechanical conditions for actuators. Hydraulic balancing of heating circuits. Heat metering via MID-compliant heat meter with M-Bus data transfer to building automation. Insulation of all heating pipes, fittings, and distributors according to GEG, with removable insulation caps on fittings. Marking of all components according to DIN 2403 and client specifications, including flow directions. Commissioning includes flushing, pressure testing, leak testing, filling with treated heating water, venting, hydraulic balancing, functional testing of heating circuits, trial operation of the entire system, and functional heating according to DIN EN 1264 during screed drying with documentation. Documentation before acceptance in paper and digital form: revision documents, as-built plans, hydraulic diagram, valve list, manufacturer proofs, maintenance/operating manuals, pressure test, flushing, water treatment, hydraulic balancing, functional heating, adjustment protocols, manufacturer documents, CE declarations of conformity.

Kreisausschuss Main-Taunus-Kreis, Hochbau- und Liegenschaftsamt

·Hofheim am Taunus
Deadline:August 12, 2026

Compressed Air Systems for REIMS

Works on compressed air systems.

DALKIA (54)

·Pulnoy
Deadline:August 06, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now