Construction of bypass roads for Nyírbátor
Construction of the Nyírbátor South-Eastern Bypass Road (Main Road 471): 7,370 m long, 2x1-lane main road section, of which 1,044 m are on the existing connecting road 4915 and 6.4 km on a new alignment (divided into 2,626 m new, 1,044 m existing, 3,700 m new); 1 bridge with 51.45 m superstructure length, 29.74 m clear span, two openings, 19.17+31.17 m support distribution, 11.13 m cross-sectional width, reinforced concrete deck, and 120 cm high precast reinforced concrete girders; 4 new roundabouts and a new direct branch for an existing roundabout; 2 bus bay pairs; local bicycle path and sidewalk corrections; the construction service is considered an indivisible service; further items as per the tender documents.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 573843-2026HTML
- TED PDF — 573843-2026PDF
- TED XML — 573843-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.
Lots (2)
- LOT-0001Bau der südöstlichen Umgehungsstraße Nyírbátor
- LOT-0002Bau der westlichen Umgehungsstraße Nyírbátor