Skip to main content
Activeted-468810-2026

Construction Works for the Rehabilitation of Tram Lines Pod Roș – Anastasie Panu

Construction works for the rehabilitation and extension of tram lines Pod Roș – Anastasie Panu in Iași: Rehabilitation of approximately 1,670 m of existing single track, network extension on the Sfântul Lazăr – Anastasie Panu axis, installation of grooved rail in elastic vibration damping slabs, lowering of the red line on Sfântul Lazăr street (average 50-75 cm) for a maximum gradient of 6%. This also includes consolidation and support works of high geotechnical complexity, including the execution of reinforced concrete retaining walls (up to 6.00 m deep) and sheet piling systems. Road, sidewalk, and urban landscaping works comprise the restoration of the street network with MAS 16 asphalt with polymers, the arrangement of sidewalks with interlocking pavers and cobblestones in historically protected areas, and the installation of granite curbs and demarcation of the track with protective bollards. Electrical installations and power supply (contact wire) involve the complete replacement of the contact wire and support systems, the installation of new multifunctional poles (TFM) for contact line support and LED public lighting, and the modernization of the rectifier substation and injection points. Intelligent Transport Systems (ITS) include the implementation of an adaptive traffic light system with tram prioritization at intersections, the installation of CCTV video monitoring systems, e-ticketing, and real-time passenger information panels. The estimated contract value is 94,854,268.26 Lei without VAT, of which 89,023,777.26 Lei for construction and assembly (Object 1: 53,617,693.31 Lei; Object 2: 35,406,083.95 Lei) and 5,717,091.00 Lei for equipment (Object 1: 5,571,591.00 Lei; Object 2: 145,500.00 Lei). The execution period is 18 months from the start of works. Further items as per the tender documents.

RON 94,854,268
View original source

CONTRACTING AUTHORITY

Name

Municipiul Iasi

City

Iasi

Country

RO

CLASSIFICATION

Procedure Type

Open Procedure

Contract Type

Works

Main CPV

45234126, Tramline construction works.

Other CPV

45232200, Ancillary works for electricity power lines.

45232221, Transformer substation.

ADDITIONAL DETAILS

EU Funded

Yes

Electronic Submission

Required

Legal Basis

32014L0024

DEADLINES & TIMELINE

Submission Deadline

23 days remaining

(LOT-0000)

Published

TENDER DOCUMENTS

23 days remaining

Similar Tenders

Explore CPV 45
RON 34.2M

Construction Works for the Expansion of Dimitrie Cantemir High School, Exterior Facilities, Running Track, and Sports Areas

Construction works for the expansion of the educational unit of Dimitrie Cantemir High School, exterior landscaping, vertical systematization, construction of a running track and outdoor sports facilities: building infrastructure and superstructure works, interior and exterior finishing works, execution of running track, sidewalks and exterior landscaping, electrical installations and power supply, sanitary installations, thermal installations, low current electrical installations.

Municipiul Iasi

·Iasi
Deadline:August 28, 2026
RON 203.2M

Conversion of CET II HOLBOCA Power Plant from Coal to Natural Gas with H2-Ready CHP Units: Design and Execution

Design, technical assistance, equipment procurement, and execution of works for the conversion of the CET II HOLBOCA power plant from coal to natural gas by installing new H2-ready combined heat and power (CHP) units: Elaboration of technical documentation for permits and construction permits, execution details, technical assistance during execution and acceptance phases, handover of as-built documentation and the technical construction book. Documentation is based on the Feasibility Study (H.G. nr. 907/2016) and national standards. This includes manufacturing and delivery of technological equipment and machinery, execution of construction and installation works including utility connections (natural gas, electricity, potable water, sewage) and technological connections (electricity, natural gas, treated water, heating water, sewage). Furthermore, performance of technological tests and trials, training of operator's exploitation personnel, commissioning of the investment objective with performance demonstration, and remediation of defects during the warranty period. The contract duration is 26 months, comprising 4 months for design and 22 months for execution of works.

Municipiul Iasi

·Iasi
Deadline:September 18, 2026
RON 178.3M

Design, Technical Assistance, and Execution of Works for New CHP Equipment Installation in CET I Iași

Design, technical assistance, equipment procurement, and execution of works for the installation of new useful thermal energy production equipment in cogeneration (CHP) at CET I Iași: This includes the preparation of technical documentation for all necessary approvals and building permits, the elaboration of the technical project and execution details, technical assistance by specialized designers during execution and acceptance phases, and the submission of as-built documentation and the technical book of the construction. The execution involves the manufacturing and delivery of technological equipment and machinery, construction and installation works including utility connections (natural gas, electricity, potable water, sewage), installation of technological equipment and machinery including technological connections (electricity, natural gas, treated water, district heating water, sewage), conducting technological tests and trials, training of the operator's personnel, commissioning of the investment objective including demonstration of guaranteed performance, and remediation of defects during the warranty period. The contract duration is 26 months, with 4 months for design and 22 months for execution of works.

Municipiul Iasi

·Iasi
Deadline:September 07, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now