Design, Technical Assistance, and Execution of Works for New CHP Equipment Installation in CET I Iași
Design, technical assistance, equipment procurement, and execution of works for the installation of new useful thermal energy production equipment in cogeneration (CHP) at CET I Iași: This includes the preparation of technical documentation for all necessary approvals and building permits, the elaboration of the technical project and execution details, technical assistance by specialized designers during execution and acceptance phases, and the submission of as-built documentation and the technical book of the construction. The execution involves the manufacturing and delivery of technological equipment and machinery, construction and installation works including utility connections (natural gas, electricity, potable water, sewage), installation of technological equipment and machinery including technological connections (electricity, natural gas, treated water, district heating water, sewage), conducting technological tests and trials, training of the operator's personnel, commissioning of the investment objective including demonstration of guaranteed performance, and remediation of defects during the warranty period. The contract duration is 26 months, with 4 months for design and 22 months for execution of works.
CONTRACTING AUTHORITY
Name
Municipiul Iasi
City
Iasi
Country
RO
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45251220, Cogeneration plant construction work.
Other CPV
39715210, Central-heating equipment.
45251140, Thermal power plant construction work.
45255400, Fabrication work.
71000000, Architectural, construction, engineering and inspection services.
71320000, Engineering design services.
71356200, Technical assistance services.
ADDITIONAL DETAILS
EU Funded
Yes
Electronic Submission
Required
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
44 days remaining(LOT-0000)
Published