Building Physics for Replacement New Build Bad Forstenrieder Park
Planning services for building physics: according to HOAI 2021, Annex 1 (to §3 paragraph 1), further specialist planning and consulting services as per section 1.2.2 Service Profile Building Physics, AHO publication series No. 23 (thermal insulation and energy balancing, as of 08/2022) and AHO publication series No. 44 (building acoustics, room acoustics, noise immission control, as of 07/2023) for the replacement new build of an indoor swimming pool with an estimated gross floor area of approx. 9,156 m². The project scope includes a 25-m sports pool with 50-m pool extension, a movable partition wall and a 1-m diving board; a teaching pool with a movable floor and Ninja Parcours; an indoor and outdoor children's paddling area with spray park; an outdoor pool with swim-through channel and cover; a 70 m adventure slide; an indoor and outdoor sauna area; photovoltaics on the roof areas, and the restoration and redesign of the outdoor areas with sunbathing lawn, bicycle and car parking spaces. Project-specific requirement is the application of the BIM method (use of industry-standard documents such as AIA and BAP, use of a BIM-enabled project platform, collaborative working method) with the goal of an as-built model.
CONTRACTING AUTHORITY
CLASSIFICATION
Procedure Type
neg-w-call
Contract Type
Services
Main CPV
71300000, Engineering services.
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
Yes
Electronic Submission
Required
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
25 days remaining(LOT-0000)
Published