Electrical Installations and Network Technology for the New HS MW Library
Electrical installations and network technology for the new HS MW library: 1 central battery system 40 Ah / 3h nominal operating time, 1 central UPS system 60 kVA 380/230V with 30 minutes bridging time, 1 main building distribution board with 630A nominal current and 2 outgoing feeder panels, 7 floor sub-distribution boards as standing cabinets 125A with DIN rail devices and KNX components for controlling external blinds and lighting, 280 KNX installation devices for operating external blinds and lighting including programming and creation of a requirements specification, 1,450 m cable tray systems mounted on ceiling and raw floor, approx. 65.00 m cables and wires in various cross-sections, approx. 700 conventional installation devices such as sockets and switches, approx. 150 linear pendant and surface-mounted luminaires with individual length, approx. 120 table luminaires, 285 cylindrical surface-mounted downlights, 300 pictogram and safety luminaires, lightning protection system according to BSK II for approx. 2,200 m² gravelled flat roof, 6 network server cabinets with integrated air conditioning (air/water heat exchanger) and cold/hot aisle containment, 2 network data cabinets as floor distributors, 645 network connection sockets, approx. 28,000 m data cable Cat. 7A / AWG 22, approx. 300 m single-mode fiber optic cable, approx. 30 m² dissipative raised floor, 26 outdoor wall-mounted luminaires, 11 mast luminaires, 8 bollard luminaires. Use of the PlanTeamSpace (PTS) platform for plan exchange is required.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 563274-2026HTML
- TED PDF — 563274-2026PDF
- TED XML — 563274-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.