Energy and Heat Contracting for Fellbach Wastewater Treatment Plant: Conception, Planning, Implementation, and Operation

Status
Active
Submission Deadline
27 days remaining
Contracting authority
Stadt Fellbach. Eigenbetrieb Stadtentwässerung Fellbach
Location
Fellbach, Germany
Procedure
Negotiated procedure with prior call for competition · Services
Category
Energy and related services.
Published
Reference
ted-546219-2026

Conception, planning, implementation, and operation of an energy and heat contracting model for the Fellbach wastewater treatment plant as part of an overall energy concept: The concept considers the EU Municipal Wastewater Directive (RL 2024/3019) and includes power generation from sewage gas (e.g., through installation of one or more combined heat and power plants, including evaluation of potential grid-independent operation), installation of a natural gas boiler for peak heat load coverage or as a redundancy system, direct use of generated electricity within the treatment plant, evaluation and implementation of an additional photovoltaic system, and evaluation and integration of a battery storage system to increase the degree of self-sufficiency. The goal is a technically and economically optimized supply concept for emission reduction and increased supply security with a high degree of self-sufficiency and stable supply. The operating concept must present measures for fail-safety and on-site personnel availability for plant operation. An operating period of 15 years, possibly with an extension option, is planned. The timeline foresees concept deepening, planning, and start of execution (at least component ordering) from December 2026, with the possibility of fulfilling the requirements according to § 6 I No. 1 Combined Heat and Power Act. Construction will commence from January 2027, with commissioning by July 2027 at the latest. Currently, two sewage gas CHP units have been out of service since November 2024; a rented sewage gas CHP with 100 kW electrical output is temporarily in use. Peak thermal load is covered by a 350 kW gas boiler that requires renewal. A photovoltaic system with 61 kWp is already present on the treatment plant roof. The renovation of existing sewage gas storage tanks is also planned.

Free

Never miss a tender again

We send you 3 current matches that fit your company.

With a number we call briefly to sharpen your search profile.

No account neededReply in 1-2 business days

By submitting, you agree that Patterno sends you matching tenders by email and, if you leave a number, calls you once about it. Revocable at any time. Privacy policy


Tender documents

  • Portal — LOT-0001NON-RESTRICTED-DOCUMENT
  • TED HTML — 546219-2026HTML
  • TED PDF — 546219-2026PDF
  • TED XML — 546219-2026XML
Free

Unlock documents for free

Enter your email address. If you confirm, we will also send you 3 similar tenders.

No account neededReply in 1-2 business days

By submitting, you agree that Patterno sends you matching tenders by email. Free, unsubscribe anytime. Privacy policy


Additional details

EU Funded
Yes
Suitable for SMEs
No
Electronic Submission
Required
Legal Basis
32014L0024
Live webinar

See Patterno work on a real tender

45 minutes live, questions answered in the chat. Upcoming dates on the signup page.

  • Matches from 4,500+ portals in one workspace
  • Qualify any tender against your criteria in minutes
  • Prepare bid documents from your company context

Prefer a private session?