Power Supply Infrastructure for Port Polska: RPZ, GPO-C, and 110 kV Cable Lines
Construction of power supply infrastructure for the Port Polska investment: includes RPZ buildings (110 kV/15 kV), GPO-C station building (110 kV/15 kV), generator station buildings, and 110 kV cable lines connecting to the national power grid. The contract is divided into seven tasks, all part of a single agreement: Task 1 covers construction and design work for the connection to the 110/110 kV PGE Station with 110 kV lines on the east and south sides of the airport; Tasks 2 to 5 cover construction and design work for the distribution points RPZ-1 to RPZ-4, each with a SCADA system; Task 6 covers construction and design work for the connection to the 400/110 kV PSE Station with 110 kV lines on the west and north sides of the airport; Task 7 covers construction and design work for the GPO-C Station with 110 kV grid connection and SCADA system.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Restricted — LOT-0001RESTRICTED-DOCUMENT
- TED HTML — 526807-2026HTML
- TED PDF — 526807-2026PDF
- TED XML — 526807-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.