Design and Construction of Traction Substations for High-Speed Rail Lines LK85 (Warsaw-Łódź) and LK86 (Sieradz-Wrocław)
Design, construction, permitting, and commissioning of power supply infrastructure for high-speed rail lines Warsaw-Łódź and Sieradz-Wrocław: three NN/2x25 kV traction substations (PT CPK 400/2x25 kV, PT Dmosin 220/2x25 kV for Warsaw-Łódź; PT Kuźnica-Czajków 400/2x25 kV for Sieradz-Wrocław), high-voltage cable lines connecting traction substations to PSE S.A. power stations, connection of traction substations to the railway traction network via autotransformer cabins and fiber optic backbone, and telecommunication, automation, and control systems (including telemechanics, SCADA, communication systems). An option for additional substations for lines LK85 and LK86 is included.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Restricted — LOT-0001RESTRICTED-DOCUMENT
- TED HTML — 533181-2026HTML
- TED PDF — 533181-2026PDF
- TED XML — 533181-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.