Replacement new construction of the Cäcilienbrücke bridge
Replacement new construction of the Cäcilienbrücke lift bridge: Technical processing including complete execution planning, partial demolition (basement deconstruction), noise barriers, unexploded ordnance detection, special civil engineering works (bored piles, sheet piles, re-anchoring with anchor piles, excavation shoring, dewatering, slope stabilization, soil analyses, soil disposal), fiber optic measurement system on bored piles, solid and masonry construction in civil and structural engineering, technical equipment, traffic engineering, drive and electrical engineering, and control and remote operation of movable bridges (including technical processing), mechanical engineering and hydraulic equipment (including technical processing, assembly, commissioning, and trial operation), steel bridge construction and corrosion protection, bridge equipment, drainage, wet dredging and earthworks, culvert construction, scour protection works, pipeline construction, house connections for water and wastewater, and telecommunication systems.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 637056-2026HTML
- TED PDF — 637056-2026PDF
- TED XML — 637056-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.