Skip to main content
Activehilma-EF-53604

Preparation of Forest Management Plans for the Municipality of Siikalatva

Preparation of forest management plans for the Municipality of Siikalatva: Planning for the years 2027-2037.

CONTRACTING AUTHORITY

Name

Siikalatvan kunta

Country

FI

CLASSIFICATION

Procedure Type

Open Procedure

Contract Type

Services

Main CPV

77231900, Forest sectoral planning services.

ADDITIONAL DETAILS

Suitable for SMEs

Yes

Electronic Submission

Required

DEADLINES & TIMELINE

Submission Deadline

22 days remaining

(LOT-0000)

Published

TENDER DOCUMENTS

22 days remaining

Similar Tenders

Explore CPV 77

Timber Skidding and Tractor Operations, Framework Agreement 2026-2028

Framework agreement for timber skidding and tractor operations: comprises three lots with an estimated volume of approx. 3,000 fm to approx. 4,000 fm and approx. 1,000 to approx. 1,400 hours per lot, duration 2026-2028.

Nationalparkverwaltung Bayerischer Wald

·Grafenau
Deadline:August 20, 2026

Green area maintenance for CAPI Seville

Green area maintenance: Maintenance and upkeep of the green areas of the Centro de Acogida y Protección Internacional (CAPI) in Seville.

Dirección General de Gestión Migratoria

·Madrid
Deadline:August 17, 2026

Afforestation for the Hamm-West Wastewater Treatment Plant

Afforestation work at the Hamm-West wastewater treatment plant of the Lippeverband.

Lippeverband

·Essen
Deadline:September 01, 2026

Construction works for railway access to Lubiatowo – Kopalino Nuclear Power Plant, Wejherowo – Choczewo section

Construction works for railway access to the Lubiatowo – Kopalino Nuclear Power Plant, Wejherowo – Choczewo section: includes the execution of works in the areas of track surface and subgrade, drainage, railway traffic control devices (srk), telecommunication devices and systems, traction network with power supply, electrical power devices and systems up to 1 kV, engineering structures, platforms and building structures, crossings and level crossings, sanitary works, and geology. Also included are construction works for environmental protection facilities and the preparation of as-built documentation, comprising technical regulations (based on Ir-3 Instruction), geodetic as-built documentation (line picketage and longitudinal profile, acceptance protocols for track axis adjustment marks, numerical situational-height map with geodetic as-built inventory), documentation for the establishment and measurement of the basic and special railway geodetic control networks, and new schemes for traffic posts and expedition points. Detailed information is provided in the Technical Specifications for the Execution and Acceptance of Construction Works (STWIORB) and the descriptive and drawing part of the Project Documentation (Volume III SWZ), as well as in the Bill of Quantities (Volume IV SWZ).

PKP Polskie Linie Kolejowe S.A.

·Warszawa
Deadline:July 28, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now