Roadway renewal S 297 north of Herlasgrün
Roadway renewal on S 297 north of Herlasgrün: approx. 1,200 m length under full closure, including site setup and clearance, traffic safety and detour establishment. The roadway will be renewed by milling 8,350 m² of asphalt surface course (4.5 cm) and 320 m² of asphalt binder course (5.5 cm), installation of 320 m² of 5.5 cm asphalt binder course AC 16 B S, 25/55-55 A and 8,350 m² of 4.5 cm asphalt surface course AC 8 D S, PmB 25/55-55 A. Furthermore, services include the removal and reconstruction of 2,000 m of shoulders, and the renewal of existing traffic equipment (removal of old guide posts, supply and installation of new guide posts, renewal of small signage, final marking). Planning services involve obtaining traffic orders, shaft certificates, and inventory. Construction work begins on 12.10.2026, ends on 06.11.2026, with a full closure duration of 26 calendar days. Alternative bids are not permitted, multiple main bids are allowed. A performance bond of 5% of the contract sum and a warranty bond of 3% of the invoice sum are required. Proofs are required according to MVAS for traffic safety, ZTV M for markings (qualified specialist and company), ZTV VZ for vertical traffic signs (manufacturer certification), and RAL quality mark for traffic sign manufacturing, as well as 3 references for comparable services. Further items as per the tender documents.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- 25699752NON-RESTRICTED-DOCUMENT
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.