Skip to main content
All tenders

Geothermal Well Kruszwica GT-1 for Thermal Water Resource Exploration

Status
Active
Submission Deadline
13 days remaining
Contracting authority
Location
Kruszwica, Poland
Procedure
Open Procedure · Works
Category
Drilling and exploration work.
Published
Reference
ted-556217-2026

Geothermal well Kruszwica GT-1: Exploration and development of thermal water resources in Lower Jurassic and optionally Lower Cretaceous formations in the Kruszwica region. The scope includes drilling a vertical exploration well Kruszwica GT-1 to a projected depth of 3,290 m (±10 %), with the Lower Jurassic top expected at approximately 2,750 m. Geological supervision will continuously adjust drilling depth, well construction, casing, and testing. Works involve preparing an operational plan and all necessary documents, obtaining permits (especially from the District Mining Office), and preparatory works such as site security, drilling site setup, and utility supply (power, water, wastewater disposal, temporary wastewater tank). Also included are the installation of the well structure with casing columns (24", 18 5/8”, 13 3/8”, 9 5/8”) and a filter column (6 5/8”), wellhead completion, geophysical logging after each section (diameter, curvature, litho-stratigraphic profile, layer dip, permeable intervals, casing cementation status, Production Log test, temperature distribution), sampling of rock, water, and gas. Also included are the supply and installation of a submersible pump, cleaning pumping, and hydrogeological investigations (hydrodynamic tests with three yield stages). In case of a positive drilling result, a production wellhead will be supplied and installed; in case of a negative result, the well will be liquidated and the site restored. Finally, a geodetic survey report and as-built documentation must be prepared, covering all drilling and service reports, projects, and protocols, to enable the creation of hydrogeological documentation for the thermal water resources. Geological works also include geodetic demarcation, construction site preparation with environmental protection and fencing, provision of an equipped control and measurement laboratory (AKP) with personnel, a social and office container (min. 15 m²) for 24/7 operation, utility supply for all facilities, transport and assembly of the drilling rig, and its commissioning. Drilling and testing of the well, including the installation and cementing of casing columns (24”, 18 5/8”, 13 3/8”, 9 5/8”) and the filter column (6 5/8”), will be carried out in 5 sections to ensure long-term, trouble-free operation under high mineralization, temperature, and pressure conditions.

Free

Never miss a tender again

We send you 3 current matches that fit your company.

With a number we call briefly to sharpen your search profile.

No account neededReply in 1-2 business days

By submitting, you agree that Patterno sends you matching tenders by email and, if you leave a number, calls you once about it. Revocable at any time. Privacy policy


Tender documents

  • Portal — LOT-0001NON-RESTRICTED-DOCUMENT
  • TED HTML — 556217-2026HTML
  • TED PDF — 556217-2026PDF
  • TED XML — 556217-2026XML
Free

Unlock documents for free

Enter your email address. If you confirm, we will also send you 3 similar tenders.

No account neededReply in 1-2 business days

By submitting, you agree that Patterno sends you matching tenders by email. Free, unsubscribe anytime. Privacy policy


Additional details

EU Funded
Yes
Electronic Submission
Required
Legal Basis
32014L0024
Live webinar

See Patterno work on a real tender

45 minutes live, questions answered in the chat. Upcoming dates on the signup page.

  • Matches from 4,500+ portals in one workspace
  • Qualify any tender against your criteria in minutes
  • Prepare bid documents from your company context

Prefer a private session?