Drywall works for InFonaL Research Building at Anhalt University, Köthen Drywall works: 1,200 m² drywall (150 mm, F0), 55 m² drywall (200 mm, F0), 42 m² drywall (250 mm, F0), 25 m² drywall (275 mm, F0), 860 m² drywall (300 mm, F0), 25 m² installation wall (530 mm, F0), 145 m² cement drywall (150 mm, F0), 105 m² cement drywall (300 mm, F0), 13 m² cement drywall (350 mm, F0), 4 m² drywall (150 mm, F30-A), 17 m² drywall (300 mm, F30-A), 280 m² drywall (150 mm, F90-A), 63 m² drywall (275 mm, F90-A), 40 m² drywall (300 mm, F90-A); 10 m² furring (175 mm), 25 m² furring (225 mm), 67 m² furring (250 mm), 25 m² furring (25 mm), 10 m² cement furring (75 mm); 118 units creation of door openings; 700 m² cladding with GKBI boards; 385 m covering of reinforced concrete columns; 7 m ceiling bulkhead (150 mm), 43 m ceiling bulkhead (300 mm), including creation and closing of wall cutouts, built-in parts, and reinforcements; 780 m² suspended ceilings gypsum perforated (F0), 165 m² suspended ceilings gypsum smooth; 710 m perimeter frieze, including openings, ceiling cutouts, inspection hatches, and various reinforcements; 144 units vertical slat sun protection, 8 units sun protection curtain, 120 m picture rails. Start of execution: 16.11.2026, completion of stud frame walls and plinth cladding on both sides ground floor: 14.12.2026, completion of stud frame walls and plinth cladding on both sides 1st and 2nd upper floors: 20.01.2027, end of execution: 10.12.2027.
Amt für Immobilien- und Baumanagement MD (AIB Magdeburg), Zentraleinheit Vergabe
· Magdeburg