Skip to main content
Activeted-482368-2026

HVAC and Refrigeration Systems for InFonaL Research Building, Anhalt University Köthen

HVAC and refrigeration systems: 1 HVAC unit (heat recovery, heating, air filtration) with 7,400 m³/h, 3 HVAC units (heat recovery, heating, cooling, air filtration) with 18,600 m³/h, 12,200 m³/h, and 15,300 m³/h, 1 smoke exhaust roof fan with 10,000 m³/h, 2 roof fans for kitchen exhaust up to 5,600 m³/h, 5 decentralized fans up to 890 m³/h, approx. 3,700 m² rectangular ducts and fittings made of galvanized steel sheet, approx. 680 m² rectangular ducts and fittings made of plastic (PPs), approx. 2,600 m² thermal and cold insulation for air ducts and fittings, approx. 146 m² rectangular ducts and fittings or cladding for steel sheet ducts made of fire protection silicate boards, approx. 530 m round air ducts made of galvanized steel and fittings (DN 74 - 400), approx. 450 m round air ducts and fittings made of plastic (PPs, DN 75-315), approx. 345 m round air ducts and fittings made of stainless steel (DN 75-250), 123 fire dampers (round, rectangular) with spring return actuator, 158 variable and constant air volume flow controllers including laboratory air control, 266 supply and exhaust air outlets, 16 textile air outlets, 3 extractor hoods as central and wall-mounted hoods up to 3,000 m³/h; additionally, refrigeration units consisting of 3 water-cooled compression chillers with 220 kW, 40 kW, and 130 kW (indoor installation), 3 dry coolers with 295 kW, 61 kW, and 176 kW (roof installation), 4 buffer tanks up to 3,000 l, 18 circulation pumps, 2 plate heat exchangers up to 160 kW, 80 fan coil units (cooling only or heating/cooling), approx. 2,680 m steel pipe and stainless steel with press connection (OD 18 to DN 76.1 mm), approx. 370 m black steel pipe with welded connection (OD 88.9 to 159 mm), approx. 2,600 m cold insulation made of synthetic rubber, 376 shut-off valves DN 15 to DN 150, and 2 walk-in cooler/freezer combinations in sandwich construction including refrigeration equipment.

CONTRACTING AUTHORITY

Name

Amt für Immobilien- und Baumanagement MD (AIB Magdeburg), Zentraleinheit Vergabe

City

Magdeburg

Country

DE

CLASSIFICATION

Procedure Type

Open Procedure

Contract Type

Works

Main CPV

45331200, Ventilation and air-conditioning installation work.

Other CPV

45331231, Installation work of refrigeration equipment.

ADDITIONAL DETAILS

EU Funded

Yes

Suitable for SMEs

Yes

Electronic Submission

Required

Legal Basis

32014L0024

8 days remaining

Similar Tenders

Explore CPV 45

Drywall works for InFonaL Research Building at Anhalt University, Köthen

Drywall works: 1,200 m² drywall (150 mm, F0), 55 m² drywall (200 mm, F0), 42 m² drywall (250 mm, F0), 25 m² drywall (275 mm, F0), 860 m² drywall (300 mm, F0), 25 m² installation wall (530 mm, F0), 145 m² cement drywall (150 mm, F0), 105 m² cement drywall (300 mm, F0), 13 m² cement drywall (350 mm, F0), 4 m² drywall (150 mm, F30-A), 17 m² drywall (300 mm, F30-A), 280 m² drywall (150 mm, F90-A), 63 m² drywall (275 mm, F90-A), 40 m² drywall (300 mm, F90-A); 10 m² furring (175 mm), 25 m² furring (225 mm), 67 m² furring (250 mm), 25 m² furring (25 mm), 10 m² cement furring (75 mm); 118 units creation of door openings; 700 m² cladding with GKBI boards; 385 m covering of reinforced concrete columns; 7 m ceiling bulkhead (150 mm), 43 m ceiling bulkhead (300 mm), including creation and closing of wall cutouts, built-in parts, and reinforcements; 780 m² suspended ceilings gypsum perforated (F0), 165 m² suspended ceilings gypsum smooth; 710 m perimeter frieze, including openings, ceiling cutouts, inspection hatches, and various reinforcements; 144 units vertical slat sun protection, 8 units sun protection curtain, 120 m picture rails. Start of execution: 16.11.2026, completion of stud frame walls and plinth cladding on both sides ground floor: 14.12.2026, completion of stud frame walls and plinth cladding on both sides 1st and 2nd upper floors: 20.01.2027, end of execution: 10.12.2027.

Amt für Immobilien- und Baumanagement MD (AIB Magdeburg), Zentraleinheit Vergabe

·Magdeburg
Deadline:September 04, 2026

Scaffolding work for InFonaL research building, Anhalt University, Köthen

Scaffolding work: 3,350 m² facade scaffolding with 34 weeks standing time, including platform widening and 2 units of side protection; 4 set-down platforms; 1 stair access point; 2 ladder access points; system lattice girders; 484 m³ room scaffolding with 10 weeks standing time.

Amt für Immobilien- und Baumanagement MD (AIB Magdeburg), Zentraleinheit Vergabe

·Magdeburg
Deadline:September 01, 2026

Sanitary Installation for New Laboratory and Administration Building in Halle

Sanitary installation for the new construction of a laboratory and administration building: 1,740 m sound-insulated wastewater pipe made of PP DN 50 - 125, 345 m hot-dip galvanized steel wastewater pipe DN 32 - 200, 5,300 m stainless steel (1.4401) drinking water pipe 54x1.5mm - 15x1.0mm, 81 pcs. sanitary ceramic objects, 400 m dry fire extinguishing pipe made of galvanized steel DN 50 - 80, 20 pcs. flush-mounted fire water extraction cabinets, 150 pcs. fire extinguishers (ABC powder, AB foam, B CO2).

Amt für Immobilien- und Baumanagement MD (AIB Magdeburg), Zentraleinheit Vergabe

·Magdeburg
Deadline:August 24, 2026

Painting Work for the Renovation of the Central School Building, Landesschule Pforta

Painting work as part of the renovation of the listed school building of Landesschule Pforta in Naumburg. The measure includes the monochrome treatment of the administrative, classroom and social rooms as well as the reconstructive treatment of the secondary staircase. The main quantities include extensive wall and ceiling coatings with silicate paint and plastering work. The painting trade completely dominates this tender.

Amt für Immobilien- und Baumanagement MD (AIB Magdeburg), Zentraleinheit Vergabe

·Magdeburg
Deadline:August 11, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now