Drywall works for InFonaL Research Building at Anhalt University, Köthen
Drywall works: 1,200 m² drywall (150 mm, F0), 55 m² drywall (200 mm, F0), 42 m² drywall (250 mm, F0), 25 m² drywall (275 mm, F0), 860 m² drywall (300 mm, F0), 25 m² installation wall (530 mm, F0), 145 m² cement drywall (150 mm, F0), 105 m² cement drywall (300 mm, F0), 13 m² cement drywall (350 mm, F0), 4 m² drywall (150 mm, F30-A), 17 m² drywall (300 mm, F30-A), 280 m² drywall (150 mm, F90-A), 63 m² drywall (275 mm, F90-A), 40 m² drywall (300 mm, F90-A); 10 m² furring (175 mm), 25 m² furring (225 mm), 67 m² furring (250 mm), 25 m² furring (25 mm), 10 m² cement furring (75 mm); 118 units creation of door openings; 700 m² cladding with GKBI boards; 385 m covering of reinforced concrete columns; 7 m ceiling bulkhead (150 mm), 43 m ceiling bulkhead (300 mm), including creation and closing of wall cutouts, built-in parts, and reinforcements; 780 m² suspended ceilings gypsum perforated (F0), 165 m² suspended ceilings gypsum smooth; 710 m perimeter frieze, including openings, ceiling cutouts, inspection hatches, and various reinforcements; 144 units vertical slat sun protection, 8 units sun protection curtain, 120 m picture rails. Start of execution: 16.11.2026, completion of stud frame walls and plinth cladding on both sides ground floor: 14.12.2026, completion of stud frame walls and plinth cladding on both sides 1st and 2nd upper floors: 20.01.2027, end of execution: 10.12.2027.
CONTRACTING AUTHORITY
Name
Amt für Immobilien- und Baumanagement MD (AIB Magdeburg), Zentraleinheit Vergabe
City
Magdeburg
Country
DE
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45324000, Plasterboard works.
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
Yes
Electronic Submission
Required
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
32 days remaining(LOT-0001)
Published