Scaffolding works for the renovation of Olympiaturm and Atrium
Scaffolding works: Space frame scaffolding for the basket level with a cylindrical base area of 530 m² and an average height of approx. 6 m; ropeway with a loading/unloading height difference of approx. 170 m; space frame scaffolding for the visitor basket with a cylindrical base area of 163 m² and facade scaffolding with a height of approx. 17.1 m. The reference area of the facade to be renovated is 1,100 m². Scaffolding works are from level +167.70 to approx. +193.00, designed as a circular or segmented scaffold following the tower's diameter, with a floor plan divided into 36 individual sections. Scaffolding construction Part 1 "Postkorb OK" from approx. +167.70 to approx. 179.00 serves as a substructure for the actual facade scaffolding required for facade renovation from 179.15 to approx. 191.00 m parapet top terrace level 14 (visitor platform). Full scaffolding with a weather protection cover is planned, including measures for fall protection of persons and parts. Lifting equipment for own material is the contractor's responsibility, with internal elevators available for free use.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 605983-2026HTML
- TED PDF — 605983-2026PDF
- TED XML — 605983-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.