Engineering services for connecting the Edelweiler wastewater treatment plant to the Vörbach wastewater treatment plant in Pfalzgrafenweiler
Engineering services for the planning and implementation of connecting the Edelweiler wastewater treatment plant to the Vörbach wastewater treatment plant: object planning for engineering structures (HOAI 2021, § 43) with service phases 1-9, specialist planning for technical equipment (HOAI 2021, § 55) with service phases 1-9, specialist planning for structural engineering (HOAI 2021, § 51) with service phases 1-6. The task includes preliminary planning and conceptual considerations, detailed design, and realization of the chosen solutions. Further details are available in the project description provided in the electronic project room.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Restricted — LOT-0001RESTRICTED-DOCUMENT
- TED HTML — 592050-2026HTML
- TED PDF — 592050-2026PDF
- TED XML — 592050-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.