Installation of HVAC and Sanitary Systems for the Renovation of the Former National Laboratory (INPA)
Installation of HVAC and sanitary systems: includes 2 existing buildings, 2 fresh water stations, 2 rainwater harvesting systems, 2 district heating stations to be connected, 1 domestic hot water preparation station, 2 heating systems via radiators, 1 heating system via fan coil units, 3 ventilation systems with energy recovery, 2 small ventilation systems, and 3 control systems. The work duration is 200 working days, starting in the first half of 2027.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 606556-2026HTML
- TED PDF — 606556-2026PDF
- TED XML — 606556-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.