Electrical installations for demolition and extension of Karl-Rehbein-Schule
Notice title: Karl-Rehbein-Schule Dep. II, Abbruch Haus des Handwerks und Erweiterungsbau Karl-Rehbein-Schule - Elektro
Electrical installation works: 1 low-voltage main distribution board, 9 sub-distribution boards with corresponding fittings, approx. 420 m main distributions, approx. 2,500 m laying systems, approx. 17,300 m power and low-current cables, approx. 650 installation devices, approx. 400 luminaires, 1 central battery for safety lighting with approx. 103 safety luminaires, 1 call system for disabled toilets, 1 mailbox intercom system with two additional outdoor intercoms and SIP connection, 1 electroacoustic system with approx. 125 loudspeakers, 1 fire alarm system with approx. 85 detectors and 50 acoustic signaling devices, 1 IT cabinet and approx. 103 network sockets.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 644046-2026HTML
- TED PDF — 644046-2026PDF
- TED XML — 644046-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.