Medical Gases for New Nursing Building BT C + D, kbo-Inn-Salzach-Klinikum
Installation of medical gases for the new nursing building BT C + D of the kbo-Inn-Salzach-Klinikum. Building section C: 1 pc oxygen reducing station, 1 pc compressed air reducing station, 6 pcs zone control unit 2-fold, 50 pcs oxygen gas outlet, 50 pcs compressed air gas outlet, 6 pcs CO2 connection water dispenser, 2,000 m copper pipe DN 10 to DN 32, 250 pcs fire protection penetration DN 10 to DN 32, 1 pc WC container for own trade including maintenance. Building section D: 1 pc oxygen reducing station, 1 pc compressed air reducing station, 6 pcs zone control unit 2-fold, 50 pcs oxygen gas outlet, 50 pcs compressed air gas outlet, 6 pcs CO2 connection water dispenser, 1,700 m copper pipe DN 10 to DN 32, 230 pcs fire protection penetration DN 10 to DN 32, 1 pc WC container for own trade including maintenance.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 580304-2026HTML
- TED PDF — 580304-2026PDF
- TED XML — 580304-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.