Modernization of the CCTV system on sections A21-A23 and C09-C15 with VMS and Desigo CC system upgrade
Modernization of the CCTV system on sections from station A21 Stare Bielany to station A23 Młociny (Metro Line I) and from station C09 Rondo Daszyńskiego to station C15 Dworzec Wileński (Metro Lines I and II) in Warsaw, including an upgrade of the VMS and Desigo CC systems. Stage 1 includes: agreement, development, and delivery of the executive design for CCTV system modernization at metro stations A21 Stare Bielany, A22 Wawrzyszew, A23 Młociny, C09 Rondo Daszyńskiego, C10 Rondo ONZ, C11 Świętokrzyska, C12 Nowy Świat-Uniwersytet, C13 Centrum Nauki Kopernik, C14 Stadion Narodowy, C15 Dworzec Wileński; delivery, installation, and commissioning of devices; migration of the existing VMS system to the new WMVare ESXI 8.0.3 virtualization environment; execution and delivery of as-built documentation. Stage 2 includes: obtaining written corporate consent from the Tunnel Protection System (SOT) contractor, ATREM S.A. (Pl. Kościeleckich 3, 85-033 Bydgoszcz, NIP: 777-242-80-84), to maintain warranty, guarantee, and proper operation declaration of the SOT system after the VMS and Desigo CC application update; agreement, development, and delivery of the work schedule and executive design; delivery and replacement of workstations; upgrade of VMS system servers, workstations, and recorders to the latest version of VMS and Desigo CC applications, including all client and operator stations; execution and delivery of as-built documentation. The work must be performed according to Technical Specification, Appendix No. 1.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 558911-2026HTML
- TED PDF — 558911-2026PDF
- TED XML — 558911-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.