Grid Connection for Rybnik Gas Power Plant
Construction and assembly works for a power evacuation system to the electricity grid, including a cable line parameter monitoring system, for the Gas Block in Rybnik: Stage 1 involves design, supply, construction, assembly, commissioning, and handover for operation of 220 kV block lines for power evacuation with necessary fiber optic connections, with handover for operation by 16.01.2030 at the latest. Stage 2 covers obtaining final and legally binding administrative decisions on compensation for property owners, to be completed by 31.12.2035 at the latest. Work commencement is the day after the contract effective date. Detailed services are described in the Functional-Utility Program (PFU) and the Draft Contract Provisions.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Restricted — LOT-0001RESTRICTED-DOCUMENT
- TED HTML — 553058-2026HTML
- TED PDF — 553058-2026PDF
- TED XML — 553058-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.