Object Planning for Drinking Water Pipeline DN 700 Stukenbrock (Senne) - Sennestadt (Bielefeld)
Engineering services for object planning of engineering structures (Annex 12 HOAI 2021): New construction of an underground drinking water transmission pipeline DN 700, route length approx. 10 km, from the Stukenbrock waterworks (Schloß Holte-Stukenbrock) to Sennestadt (Bielefeld), including associated special structures. A planning approval procedure is foreseen. The commissioning is phased: Stage 1 (basic contract) covers service phases 1-3; Stages 2 to 5 are optional, with no entitlement to their commissioning. Service period Q1 2027 to 30.09.2034.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 537208-2026HTML
- TED PDF — 537208-2026PDF
- TED XML — 537208-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.