Skip to main content
Activeted-475799-2026

Oil Thermostat for High-Temperature PEM Fuel Cell Test Bench (Project Zero4Cruise)

Oil thermostat for temperature control of the cooling circuit of a high-temperature PEM fuel cell test bench: The test bench examines fuel cell stacks with electrical outputs between 5 and 125 kW. For a short stack, a cooling capacity of 0 to 25 kW is required; for a full stack later in the project, a cooling capacity of 0 to 200 kW must be provided.

CONTRACTING AUTHORITY

Name

Deutsches Zentrum für Luft- und Raumfahrt e.V. (DLR)

City

Köln

Country

DE

CLASSIFICATION

Procedure Type

Open Procedure

Contract Type

Supplies

Main CPV

42000000, Industrial machinery.

ADDITIONAL DETAILS

EU Funded

Yes

Suitable for SMEs

Yes

Electronic Submission

Required

Legal Basis

32014L0024

DEADLINES & TIMELINE

Submission Deadline

32 days remaining

(LOT-0001)

Published

TENDER DOCUMENTS

32 days remaining

Similar Tenders

Explore CPV 42

Maritime Fuel Cell System

Delivery of a maritime fuel cell system: Design, manufacturing, and delivery of a low-temperature polymer electrolyte fuel cell and associated subsystems as a complete fuel cell system. The fuel cell serves as the main component for the “EENOK System Design” project, aiming to develop an emission-free energy container based on hydrogen and fuel cell technology, which, together with a battery and power converters, provides the necessary energy to reduce emissions from ships navigating the Kiel Canal. Further items as per the tender documents.

Deutsches Zentrum für Luft- und Raumfahrt e.V. (DLR)

·Köln
Deadline:August 10, 2026

Positioning System for Experimental Micromagnetization Processes

Positioning system for experimental micromagnetization processes: micrometer-precise positioning of magnetic write heads for the magnetization of permanent magnetic thin-film layers. The system comprises an XYR-stage for lateral translation and substrate rotation, and a Z-axis for vertical translation. The Z-axis is mounted on a specified traverse, enables sub-micrometer vertical approach, and defined contact establishment of the write head with the substrate. Both subsystems must be coordinated for specified positioning precision and trajectory movements. The traverse requires provisions for two additional, identical write heads for potential retrofitting. The mechanical mounts must be designed to allow each write head to reach any position on a 150 mm wafer; further specifications as per the tender documents.

Deutsches Zentrum für Luft- und Raumfahrt e.V. (DLR) - Stuttgart

·Köln
Deadline:August 10, 2026

Metallic Bipolar Plates for Maritime Fuel Cell Systems

As part of the BMWK Zero4Cruise project, metallic bipolar plates are needed for maritime PEMFC systems. The design requires adaptation, and 900 plates must be manufactured in two batches.

Deutsches Zentrum für Luft- und Raumfahrt e.V. (DLR)

·Köln
Deadline:August 03, 2026

Laser Lithography System for Quantum Technology Cleanroom

Procurement of a laser lithography system for manufacturing UV masks and direct lithography on target substrates for quantum technology applications.

Deutsches Zentrum für Luft- und Raumfahrt e.V. (DLR)

·Köln
Deadline:August 03, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now