Design and Construction Works for Tychy – Bieruń Stary Railway Line
Design and construction works for railway line no. 179 Tychy – Bieruń Stary: Preparation of project documentation (executive design, as-built documentation including geodetic as-built documentation), construction works on track surface and subgrade, railway traffic control systems (srk), telecommunication devices and systems, traction network with power supply, electrical power engineering devices and systems up to 1 kV, engineering structures, platforms and cubature objects, crossings and level crossings, geology; construction of environmental protection facilities; execution of conformity assessment process for structural subsystems at all stages (design, construction, final tests) and submission of relevant EC verification declarations and certificates. An option for interfaces includes the optional commissioning of changes to railway traffic control device interfaces. The implementation period for the basic scope is 27 months from contract signing, including 22 months for the completion of all works and documentation submission, and a maximum of 8 months for submitting permits for operation of structural subsystems after operational acceptance. The option for interfaces has a duration of not less than 6 months, not longer than 4 years from activation, and can be activated during the works and warranty period.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 548538-2026HTML
- TED PDF — 548538-2026PDF
- TED XML — 548538-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.