Design and Construction Works for Tychy – Bieruń Stary Railway Line
Design and construction works for railway line no. 179 on the Tychy – Bieruń Stary section: Preparation of project documentation, including executive design and geodetic as-built documentation; Construction works on track and subgrade, railway traffic control (RTC) systems, telecommunication devices and systems, traction network with power supply, electro-energetic devices and systems up to 1 kV, engineering structures, platforms and cubature objects, crossings and passages, geology; Construction of environmental protection objects; Execution of conformity assessment for structural subsystems at all stages (design, construction, final tests) and submission of relevant EC verification declarations and certificates. An option for interfaces includes the optional commissioning of changes in RTC devices regarding interfaces. The implementation period for the basic scope is 27 months from contract signing, including 22 months for completion of works and documentation handover, and a maximum of 8 months for delivery of operating permits for structural subsystems. The interface option has a duration of at least 6 months, up to 4 years from activation.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 576720-2026HTML
- TED PDF — 576720-2026PDF
- TED XML — 576720-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.