Management and Investor Supervision for the Capacity Increase of the Tczew – Gdynia Railway Line
Management and supervision of construction contract execution during planning and construction works for the project "Capacity increase of the Tczew – Gdynia railway line: Pszczółki – Pruszcz Gdański section". A material option includes management and supervision of planning and execution of construction works on railway line No. 9 (from km 307.880 to km 315.420 and from km 317.510 to km 320.110), railway line No. 226 (from km 0.060 to km 0.260), and railway line No. 260 (from km 3.494 to km 14.767). A time option for the basic scope allows for an extension of the execution period by a maximum of 12 months. Another time option for the material option scope allows for an extension by a maximum of 6 months.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 574050-2026HTML
- TED PDF — 574050-2026PDF
- TED XML — 574050-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.