Skip to main content
All tenders

Reconstruction of Track Systems and Infrastructure for Railway Lines 408 and 409 in Szczecin

Status
Active
Submission Deadline
7 days remaining
Contracting authority
Location
Warszawa, Poland
Procedure
Open Procedure · Works
Category
Construction work.Engineering design services for the construction of civil engineering works.Works for complete or part construction and civil engineering work.
Published
Reference
ted-573565-2026

Reconstruction of track systems and associated infrastructure, including railway traffic control (srk) devices, for railway lines 408, 409, 433, and 851 in the Szczecin area. The basic scope (Task A) includes construction works on railway line 408 from km 3.675 to km 7.100 (including freight group), on railway line 409 from km 0.115 to km 10.069 (including freight group), on railway line 433 from km 2.806 to km 3.145, on railway line 851 from km 0.400 to km 2.309, and the construction of a connecting track (track 301) at Szczecin Gumieńce station. Included are track works, platforms, traction network, 15kV non-traction power lines, electro-energetics up to 1 kV, drainage, sanitary installations/networks/devices, road system, engineering structures, cubature objects, geotechnics, dendrology, reconstruction of ditches and watercourses, small architecture and landscaping, and environmental protection facilities. Task B comprises the design and execution of construction works for railway traffic control (srk) devices and railway telecommunication networks, optimization of track geometry for railway line 433 at Szczecin Wzgórze Hetmańskie station, including modernization of srk devices on railway lines 432 and 433, and an additional turnout crossing between railway line 408 and 351 at Szczecin Główny station. An option for an interface is provided. The preparation of all as-built documentation is part of the contract, including technical regulations, geodetic as-built documentation, and new schemes for operational points. The implementation period is 42 months from contract signing. Completion of the basic scope is within 34 months, and completion of option rights is within 15 months each after their activation. Delivery of operating permits for structural subsystems is within 8 months after final acceptance of the respective scope. The interface option has a duration of at least 6 months and a maximum of 4 years from activation.

Free

Never miss a tender again

We send you 3 current matches that fit your company.

With a number we call briefly to sharpen your search profile.

No account neededReply in 1-2 business days

By submitting, you agree that Patterno sends you matching tenders by email and, if you leave a number, calls you once about it. Revocable at any time. Privacy policy


Tender documents

  • Portal — LOT-0001NON-RESTRICTED-DOCUMENT
  • TED HTML — 573565-2026HTML
  • TED PDF — 573565-2026PDF
  • TED XML — 573565-2026XML
Free

Unlock documents for free

Enter your email address. If you confirm, we will also send you 3 similar tenders.

No account neededReply in 1-2 business days

By submitting, you agree that Patterno sends you matching tenders by email. Free, unsubscribe anytime. Privacy policy


Additional details

Electronic Submission
Required
Legal Basis
32014L0025
Live webinar

See Patterno work on a real tender

45 minutes live, questions answered in the chat. Upcoming dates on the signup page.

  • Matches from 4,500+ portals in one workspace
  • Qualify any tender against your criteria in minutes
  • Prepare bid documents from your company context

Prefer a private session?