Engineering Inspection Services for Dike Rehabilitation/Relocation Mündelheim and Elevation of B 288
Engineering inspection services for reconstruction measures on the B 288 between Mündelheim and the Krefeld-Uerdingen Bridge over a length of approx. 1,300 m: new construction of a bridge (BW 4606 646) as a continuous beam in prestressed concrete construction over 15 spans with a total length of 558 m; overpass of the B 288 over the dike defense path (BW 4606 510) as a frame structure with a passage length of 18.50 m; necessary falsework for the construction of the bridge and overpass; one rain clarification basin in the east (BW 4606 580 A); one rain clarification basin in the west (BW 4606 504); various shoring measures for the western abutment, the rain clarification basins, and the drainage channels. Both structures are founded on bored piles. Two rain clarification basins are part of the bridge or road drainage. For the construction of the western bridge abutment, a bypass for ongoing traffic on the B 288 and shoring are planned. Further details as per the tender documents.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 549574-2026HTML
- TED PDF — 549574-2026PDF
- TED XML — 549574-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.